New and replacement driveways
Driveway Paving in Beaumont, TX
A driveway on Beaumont clay needs a real base under it and a clear path for water.
- No-cost site visit and estimate
- Line-by-line written pricing
- Permits and culvert grades sorted out up front
Driveways Built From the Ground Up
Driveway paving in Beaumont is decided below the surface. The asphalt you drive on is a couple of inches thick. What keeps it flat is the compacted crushed stone under it and the way the whole thing drains. On the slow-draining clay common around Beaumont, a driveway with a thin base or no fall to the street turns soft after a week of storms, and then the ruts, cracks and potholes follow.
Signs it is time for a new driveway
- Cracking in a web pattern across the wheel paths
- Potholes that reopen after every patch
- Low spots that hold water for a day or more
- A sag where the driveway crosses the culvert
- Edges breaking off into the grass
A few small problems can be patched. Once they are everywhere, a new driveway is usually cheaper than repeated repairs.
The base we build
After tear-out, we test the subgrade. Wet or pumping clay is cut out and replaced with compacted crushed stone. The City of Beaumont's own detail for an asphalt approach uses 6 inches of compacted crushed limestone under 2 inches of compacted hot mix, and cost guides describe 2 to 3 inches of asphalt over 6 to 8 inches of base for homes, more for trucks and trailers. Your quote states the base depth and asphalt thickness for every area, so you can compare bids honestly.
Culverts and approaches
Many Beaumont homes have an open ditch at the street with a culvert under the driveway. The city requires a permit for construction in the right-of-way, and its survey crew sets the culvert grade and confirms the pipe size before the culvert is purchased or installed. Inspections are booked through 311 after the culvert is in and backfilled. City rules also cap residential driveway slope at 12 percent and require hard surfaces to stay at least 2 feet from interior property lines. We plan the approach to fit.
Grading permit on bigger jobs
If the work on your lot disturbs more than 450 square feet of ground, Beaumont requires a grading permit as well. Most full driveway replacements reach that size. We tell you at the estimate whether yours does.
After paving
Keep cars off for a couple of days and heavy vehicles off for longer, especially in summer. Do not turn the wheel while parked, and put a pad under jacks and kickstands. Seal the driveway after three to six months, then every few years.
What This Covers
Everything from removing the old driveway to a finished, permitted approach.
Removal and haul-off
Old asphalt, concrete, shell or gravel taken out and disposed of.
Subgrade undercut
Soft clay removed and replaced with compacted crushed stone.
Culvert and approach
Pipe set to the city grade, approach built to the permit detail.
Hot-mix asphalt
Placed and rolled to the thickness written in your quote.
Edges and joints
Clean tapers at the garage, sidewalk and street.

Typical Driveway Paving Costs
| Work | Published range |
|---|---|
| New asphalt driveway (HomeGuide) | $5 to $12+ per sq ft |
| New asphalt driveway (Angi) | $7 to $15 per sq ft |
| 300 sq ft driveway (HomeGuide) | $1,500 to $3,600 |
| 500 sq ft driveway (HomeGuide) | $2,500 to $6,000 |
| 800 sq ft driveway (HomeGuide) | $4,000 to $9,600 |
| Remove and replace (Angi) | $8 to $15 per sq ft |
| City of Beaumont driveway permit | $37 residential, $77 commercial |
National published ranges, not local quotes. Area, removal, base repair and access change the cost. The written estimate we give you is the price.
How It Works
1. Visit
We measure, check drainage, the ditch and culvert, and probe for soft ground.
2. Quote and permits
Itemized quote, then right-of-way and grading permits as needed.
3. Base and culvert
Tear-out, undercut, stone base and culvert set to grade and inspected.
4. Paving
Asphalt placed and rolled, edges finished, final inspection where required.

Driveway Paving Questions
How long does a new driveway take?
Most take two to four working days, plus time for permits and inspections. Rain on the base pushes the schedule.
Can my driveway be steeper to clear the ditch?
Beaumont caps residential driveway slope at 12 percent. If the ditch is deep, the culvert grade and approach are planned so the drive stays within that.
Asphalt or concrete approach?
Beaumont accepts concrete or asphalt for new or rebuilt approaches. We build asphalt approaches to the city's detail.
Can you widen my driveway?
Yes. Beaumont limits width to 35 feet and requires a 5-foot setback from the side property line for homes. Widening at the street usually means a longer culvert and a permit.
Do I pull the permit or do you?
The city allows the owner, lessee or a bonded contractor working for them to obtain it. We tell you how we handle it on your job.
Driveway Paving Service Areas
- Asphalt Paving in Beaumont, TX
- Asphalt Paving in Port Arthur, TX
- Asphalt Paving in Nederland, TX
- Asphalt Paving in Port Neches, TX
- Asphalt Paving in Groves, TX
- Asphalt Paving in Vidor, TX
- Asphalt Paving in Lumberton, TX
- Asphalt Paving in Orange, TX
- Asphalt Paving in West Orange, TX
- Asphalt Paving in Bridge City, TX
- Asphalt Paving in Pinehurst, TX
- Asphalt Paving in Rose City, TX
- Asphalt Paving in Mauriceville, TX
- Asphalt Paving in Silsbee, TX
- Asphalt Paving in Kountze, TX
- Asphalt Paving in Sour Lake, TX
- Asphalt Paving in Bevil Oaks, TX
- Asphalt Paving in China, TX
- Asphalt Paving in Nome, TX
- Asphalt Paving in Fannett, TX
- Asphalt Paving in Hamshire, TX
- Asphalt Paving in Sabine Pass, TX
Get a Driveway Paving Estimate
Free estimates for driveway paving in Beaumont and nearby towns.